Sunshine Garage Mk IV Roadster
The construction of a Factory Five Mk IV Roadster
Site Navigation
[Skip]
Home
Build Overview
Build Blog
Construction steps
Build Checklist
Body buck construction
Front suspension
Front disc brakes
3-link
Rear brakes
Steering rack
Fuel supply
Pedal box
Brake lines
Aluminum
Emergency brake
Footbox fresh air vents
Instrument panel
Glovebox fabrication
Cooling systems
Engine Installation
Hydraulic clutch lines
Photo Album Directory
Fasteners photo album
Body buck album
Front suspension album
Front brakes
3-link
Rear brakes
Steering rack and column
Pedal box
Fuel Tank
Brake lines
Aluminum
e-brake
Footbox vents
Electrical system
Instrument panel
Glove box
Cooling system
Engine installation
Supplemental Technical Data
AN to SAE Conversion
Brake Balance v. Deceleration
Brake System Calculations
Fasteners and fittings
Fluid Line Clamp Spacing
Links to technical information:
Tap and Clearance Drill Sizes
Tools
Road and Track (2013)
Torque specs: Factory Five
Torque specs: SAE Grade 8
Steering rack and column
Unisteer
Breeze steering bushing
PS bushing in place, from rear
DS bushing in place, from rear
DS connection to X member
PS frame ‘ear’ widened
PS rear ear non-alignment
PS bolt to ears non-alignment
PS connection to X-member
Manual steering coupling from steering rack to column
Steering column in place
Outer tie rod shortened
Die on outer tie rod after cutting
Outer tie rods in place
Upper steering column with bezel
[Back To Top]